Certificate
IATF 16949:2016
ISO 9001:2015
CE
RED
D-U-N-S CERTIFICATE 2022
Quality Control
Incoming Inspection
Process Inspection
Incoming Inspection
1. First filter components meet the specifications of the customer and the company needs and the requirements of the Enviroment-related substances;
2. To ensure downstream parts/quality standards of third-party;
3. Make sure that all storage components are good.Ps: The main instrument on behalf of X-Ray Spectrometer
1. Semi-finished products in a timely manner in the production of the production process to filter bad and take corrective and preventive measures;
2. Reduce unnecessary rework, thereby reducing production costs;
3. Improve the quality of product shipments.
Ps: The main instrument on behalf of Torque tester, Tensile Tester & Swaying Tester.
1. To ensure 100% yield of the finished product quality;
2. To meet customer delivery requirement;
3. Ensure that at least after shipping 1-year limited warranty.
Ps: The main instrument on behalf of DVB-T Testing, Equipment Power Supply, Network Analyzer, ESD gun.
ESD Protected
Electronic products in the manufacturing is likely due to environmental factors which can produce electrostatic discharge (ESD). Because of the ESD, products will result in poor quality.
ESD Protected
1. Reduce the damage in ESDS components
2. Improve product reliability
3. Reduce manufacturing cost